FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
PIA 06/06/2023 - 09:56
Braksprui 10/06/2014 - 09:43
Noupoort Bulk Water REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF EXISTING WATER SUPPLY INFRASTRUCTURE AT NOUPOORT, NORTHERN CAPE PROVINCE AIA Phase 1 Anton van Vollenhoven Archaetnos CC WSP Environmental Pty Ltd - Johannesburg 19/09/2014 - 12:22
Heritage Scoping Report - SRPM 17/06/2022 - 10:26
Heritage Impact Assessment, Hakskeen Pan, in the Dawid Kruiper Local Municipality, Northern Cape, in relation to tourism and event-related development: Final Report (Revised) David Morris (Order OR-002815: Supplier E4234) 15 December Heritage Impact Assessment, Hakskeen Pan, in the Dawid Kruiper Local Municipality, Northern Cape, in relation to tourism and event-related development: Final Report (Revised) David Morris (Order OR-002815: Supplier E4234) 15 December Heritage Impact Assessment Specialist Reports David Morris McGregor Museum Enviroafrica CC 13/02/2017 - 08:56
DESKTOP PALAEONTOLOGICAL ASSESSMENT - LESEDI POWER COMPANY DESKTOP PALAEONTOLOGICAL ASSESSMENT INDEPENDENT REVIEW OF EXISTING PIA AND ADDENDUM DOCUMENT/LETTER WITH PALAEONTOLOGY IMPACT ASSESSMENT THE ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION FOR THE 75 MW HUMANSRUS PHOTOVOLTAIC (PV) 1 SOLAR POWER FACILITY (REFERRED TO AS LESEDI POWER COMPANY), NORTHERN CAPE PIA Desktop Gideon Groenewald Dr. Gideon Groenewald EARTHnSKY Environmental 25/05/2023 - 09:48
Roodewal Breeder Farm Expansion - Protocol of finds Palaeontological Specialist Reports Gideon Groenewald 05/04/2017 - 14:39
HIA Stanger Piggery, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF PROPOSED ESTABLISHMENT OF THE MANDALAY PIGGERY, KWADUKUZA (STANGER), KWAZULU-NATAL Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Green Door Environmental 01/04/2016 - 08:11
HIA report for the Water pipeline to Maroeloesfontein Andalusite Mine Heritage Impact Assessment for the Proposed Installation of a Water Pipeline from Magalies Water to the Maroeloesfontein Andalusite Mine on Portions of the Farms Moddergat 389 KQ, Kaalvlakte 416 KQ and Vlakpoort 388 KQ, south of Thabazimbi, in the Waterberg District of the Limpopo Province. 28/11/2017 - 13:56
Heritage Scoping report for the Proposed Kranspan Colliery, Mpumalanga Province Heritage Scoping report for the Proposed Kranspan Colliery, Mpumalanga Province Heritage Scoping Jaco van der Walt Heritage Contracts and Archaeological Consulting ABS Africa 10/12/2018 - 13:26
Geelstert 2 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 02/09/2020 - 15:01
Kwaggasrand Desktop PIA PIA Desktop Gideon Groenewald New GX Enviro Solutions and Logistics 16/09/2015 - 08:51
AIA Kangala Discard EIA ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KANGALA COAL MINE ON PORTIONS 1 AND REMAINING EXTENT OF PORTION 2 OF WOLVENFONTEIN 244 IR IN THE DELMAS AREA, MPUMALANGA PROVINCE Archaeological Specialist Reports Wouter Fourie, Marike Fourie Digby Wells Environmental, PGS Grave Solutions Environmental Impact Management Services (Pty) Ltd 06/07/2021 - 15:12
Bellevue Campus : The House KWAZULU-NATALAMAFA AND RESEARCH INSTITUTE APPLICATION FORM A Minor internal building work at Bellevue Campus : The House Cameron Finnie Engine Architecture 04/05/2022 - 10:30
HIA for Mayfield x 52 Heritage Impact Assessment for the Proposed New Township Development : Mayfield Extension 52, Ekurhuleni Metropolitan Municipality, Gauteng Province Stephan Gaigher 17/02/2020 - 11:00
Boitshoko PIA (2016) 26/01/2021 - 08:49
HIA, Ottos Bluff KZN PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE 24G APPLICATION PROCESS, IN TERMS OF NEMA, FOR ACTIVITIES LOCATED ON REM OF PORTION 1 OF THE FARM OTTOS BLUFF NO. 13013, OTTOS BLUFF, KWAZULU-NATAL HIA Phase 1 Frans Prins Active Heritage CC Green Door Environmental 03/06/2019 - 09:22
Lichtenburg 1 PV Amendment to Environmental Authorisation Heritage screening assessment for the proposed Amendment to the Lichtenburg 1 PV Facility, North West Province Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 16/10/2020 - 13:10
The power of a place in understanding Southern San rock engravings. Deacon, J. 1988. The power of a place in understanding Southern San rock engravings. World Archaeology 20: 129-140. Research Publication Janette Deacon 10/11/2015 - 09:40
HIA for Upgrade of Inner City Transportatino Hub, Strand Street, Cape Town Inner City Transportation Hub: Project A: Replacement of Pedestrian Bridge and Project B: Vehicular down ramp Site Name: Erven RE 14888, RE 4651 and 148638, Cape Town Location: Strand Street Cape, Town Heritage Impact Assessment Heritage Impact Assessment Specialist Reports Sarah Winter City of Cape Town Metropolitan Municipality 24/10/2016 - 13:48
Leiden Heritage EIA Report HIA Phase 1 23/09/2014 - 12:32
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF A TOWNSHIP, TO BE KNOWN AS AMOROSA EXTENSION 57, ON PORTION 1 OF HOLDING 25, AMOROSA AGRICULTURAL HOLDINGS, CITY OF JOHANNESBURG METROPOLITAN MUNCIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports J.A. van Schalkwyk Greenworx Environmental (Pty) Ltd 12/08/2021 - 10:04
Hollingwood Subsidised Housing HIA Heritage Survey of the Proposed Hollingwood Low Cost Housing Project. Pietermaritzburg, KwaZulu Natal Heritage Impact Assessment Specialist Reports 26/06/2015 - 09:32
Kagiso Basic Assessment HIA Input 15/12/2020 - 12:29
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE Archaeological Specialist Reports Nsovo Environmental Consulting Vhubvo Archaeo-Heritage Consultants 17/09/2018 - 13:40
Ndabakazi AIA AIA Phase 1 06/03/2013 - 10:12
Survey Portion 15, Duiker Eiland Phase 1 Survey Report: Portion15, Duiker Eiland Heritage Study Andrew B Smith 05/03/2021 - 11:21
Skuitdrift Palaeontological Exemption Letter - Mar'12 Recommended Exemption from Further Palaeontological Studies & Mitigation: Proposed 10 MW Solar Facility on Farm Skuitdrift 426,Kenhardt District, Northern Cape Palaeontological Specialist Reports John E Almond Natura Viva CC 30/06/2016 - 14:22
Mdletshe Letter of Exemption LETTER OF RECOMMENDATION FOR EXEMPTION FOR THE MDLETSHE (PHASE 2) RURAL HOUSING DEVELOPMENT: HLABISA LOCAL MUNICIPALITY HIA Letter of Exemption 28/03/2017 - 10:06
Vryburg Solar 3 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province Palaeontological Specialist Reports JF Durand 16/08/2018 - 16:26
Abaqulusi stream crossings Letter of notification Heritage Statement Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Geoff Silk Civil & Mining Consultant cc 21/09/2015 - 09:32
Carmel 3 - HIA 24/02/2023 - 12:47
HIA Williet Boedery THE PROPOSED NEW CULTIVATION (PIVOT) AREAS ON THE REMAINDER OF THE FARM OLIE RIVIER 170, DOUGLAS, SOL PLAATJE LOCAL MUNICIPALITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Scoping Wouter Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 15/04/2021 - 15:57
Timbavati Road Upgrade UPGRADE OF ROAD D4407 BETWEEN HLUVUKANI AND TIMBAVATI, ROAD D4409 AT WELVERDIEND AND ROAD D4416/2 BETWEEN WELVERDIEND AND ROAD P194/1 IN THE BOHLABELA REGION OF THE MPUMALANGA PROVINCE HIA Phase 1 Cherene de Bruyn PGS Heritage (Pty) Ltd NCC Environmental Services (Pty) Ltd 01/02/2021 - 11:58
Heritage Report 1993 Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. HIA Phase 1 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 08/05/2017 - 12:37
HIA Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports Ndivhuwo Eric Mathoho 25/10/2016 - 15:39
PIA for the Proposed Alignment of a Road in Fable Smallholdings near Mount Richmore, KZN PIA Desktop 23/06/2022 - 14:25
11SharpPlace, Montclair, Durban 08/08/2023 - 10:17
40718: Sky Development Diesel Depot The Proposed Upgrading of an Existing Diesel Depot on Portion 1 of the Farm Rooidam 2354, Bloemfontein, Free State Province HIA Phase 1 29/06/2018 - 09:00
PARADIGM INVESTMENT HOLDINGS- NC 10889 MP BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON A PORTION OF THE REMAINING EXTENT OF THE FARM MOTITON 509, IN THE MAGISTERIAL DISTRICT OF KURUMAN, NORTHERN CAPE 31/05/2021 - 09:35
Boitumelo Heritage Impact Assessment 30/07/2021 - 09:54
PHASE I HIA: FOUR STREETS PALACE, PARLIAMENT, BANK AND MUTUAL AND THE PROPOSED BEAUTIFICATION OF CHURCH SQUARE PHASE I HERITAGE IMPACT ASSESSMENT FOR THE FOUR STREETS PALACE, PARLIAMENT, BANK AND MUTUAL FOR THE EXTENSION OF THE PROPOSED BEAUTIFICATION OF CHURCH SQUARE AND ITS ASSOCIATED STREETS PRETORIA TSHWANE GAUTENG HIA Phase 1 Udo Kusel AM Consulting Engineers AM Consulting Engineers CTS_157792 26/02/2014 - 11:07
Heritage and Cultural Resources Impact Assessment Report Heritage Scoping Report, for Inclusion in the Environmental Scoping Report for the Proposed Kalgold Expansion Project, North West Province. Wouter Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 12/05/2021 - 21:57
Peach Tree X25 HIA Report 08/12/2017 - 09:44
PIA report Sandveld 22 kV powerline re-build PIA report Sandveld 22 kv powerline re-build 24/11/2021 - 14:21
Motivation for Exemption from a full Phase I HIA – Proposed Excelsior Abattoir Expansion Motivation for Exemption from a full Phase I Heritage Impact Assessment – Proposed Excelsior Abattoir Expansion on Erven 4051 & 4052 in Kuruman, Northern Cape Province HIA Letter of Exemption Anton Pelser EARTHnSKY Environmental 18/05/2023 - 15:28
Cartreff HIA PHASE ONE (1) ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED FOR THE CARTREFF HOUSING DEVELOPMENT HIA Phase 1 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd EnviroPro 20/09/2023 - 09:55
Kwhezi - HIA 27/02/2023 - 10:58
HIA for the proposed Tirisano PV Solar Power Project HIA for the proposed Tirisano PV Solar Power Project Heritage Impact Assessment Specialist Reports Johnny Van Schalkwyk Subsolar Energy 28/03/2020 - 08:03
HIA and PIA A Report On A Cultural Heritage Impact Assessment For A Proposed Underground Mine On Different Portions Of The Farm Schurvekop 227 Is, Close To Bethal, Mpumalanga Province and Palaeontological Impact Assessment For The Proposed Underground Mining Of The Schurvekop Coal Resource Near Bethal, Mpumalanga Province 16/05/2017 - 10:36

Pages

CSV
 
 

Search form